I finished laying the sub floor in the studio room and framed out a door between it and the bedroom. As well I repaired some wall damage. Then I started priming the studio room with stain blocker. I have gone through one gallon on the ceiling and it looks like it will require one or more gallons. Ugh!

The electrician comes on the 2 June to install the power for the three window air conditioner units needed. Then I need to lay another sub floor in what will be a foyer outside the bedroom and main living area. As well I will need to construct two new walls, install a door and then paint. Slowly it is coming together.

Destin and I spoke about the possibility have having a gas line brought in to the building for heating. I have no idea as to what this will cost or if it is possible. We shall see.
Tomorrow I have the day off so I shall continue with the painting.